Constructing the project
Architecturally, the bar has been set very high, which to put it plainly means more complicated and expensive solutions.The location, close to the track area, also implies that Skanska must accommodate the requirements of the Swedish Rail Administration, and determine whether the project will affect the Rail Administration's official requirements, and if so how.
Downtown projects are always a challenge. In terms of logistics, all projects are required to meet high standards and this has generally worked out well. Having to construct a building for a sophisticated client like Familjebostäder also means that Skanska's performance must be especially top-drawer.
The further development of the VST frame system, which is assembled at a factory in Slovakia, and international sourcing of railings and kitchen carpentry from Poland, was a challenge. Another challenge was that there is a great deal of ground water near the foundation slab. Heavy downpours complicated the foundation work, since the water could not be diverted, due to the risk of causing settlement in adjacent properties and track areas.
The project in figures
Area: 7,900 m2