9-acre
mass timber roof
3 million kg CO2e
saved with the roofing system
Our modernization of PDX involves a complete remodel of the terminal core, reconstruction of concourse B, a 150-foot, multi-floor addition between concourses C and D, and replacement of 16 passenger boarding bridges—all while the airport remained operational. A project highlight is the striking nine-acre mass timber roofing system over the entire terminal.
Port of Portland, Portland International Airport
Construction Management
Airports
Portland
Oregon
USA
We moved a 1.6-million-pound concourse connector for reuse in a different location during construction. The move took six months of pre-planning and three more months of engineering.


for Sustainable Construction

Honor Award

Project of the Year
board feet of timber
of wood lattice
tons of avoided CO2e
of timber roof
The terminal’s roof and curtain wall system are designed to move up to 24” in any direction, minimizing significant structure damage in a seismic event.