Rehab work included reconstructing two 80-foot-long approaches on the Brooklyn Bridge, one of New York City’s most recognized landmarks. Our scope included replacing 600 bridge bearings and repainting the entire structure. Throughout the work, special measures were taken to preserve elements of the historic bridge.