Fore River Bridge Replacement Design-Build

Highlights
ACEC Massachusetts
Engineering Excellence Award
41 drilled shafts
installed
Project information
The project involved constructing a new 324-foot steel vertical lift bridge carrying Route 3A over the active Fore River channel between Quincy and Weymouth. Scope included drilled shaft foundations, sequential construction of six approach spans, offsite fabrication and float-in of the movable span. It included demolition of the temporary lift bridge that maintained traffic.
Client:
Massachusetts Department of Transportation - Boston
Service:
General Contractor
Market segment:
Bridges
Size:
Start date:
Completion date:
City:
Quincy
State:
Massachusetts
Country:
USA
Cost:
$257,000,000