Our team constructed a 655 MW energy center at the Newark Terminal site. We assembled and installed a gas-fired combined cycle combustion turbine generator, steam turbine generator, condenser, plant control system and two three-pressure heat recovery steam generators. We self-performed the civil, mechanical, structural and boilermaker work.