26th Ward Water Pollution Control Plant, Plant Stabilization

Aerial view of an industrial water treatment plant with large circular tanks and buildings.

Project information

This project was completed to increase treatment reliability, meet new water treatment requirements and upgrade all stages of the treatment process. Our scope included replacing pumps, valves, fans and piping. We repaired basins and tanks as well as installed control and regulatory equipment. Control rooms, a power substation and a new chemical-handling building were added.
Client:

Hazen and Sawyer, New York City Department of Environmental Protection (required written permission-project photos)

Service:

General Contractor

Market segment:

Water & Wastewater

Start date:
Completion date:
City:

Brooklyn

State:

New York

Country:

USA

Cost:

$91,038,687

Contact

Meagan wearing a black top against a white background.

Infrastructure

Meagan Smyth

Director, Business Development & Proposals - Northeast

Meagan wearing a black top against a white background.

Infrastructure

Meagan Smyth

Director, Business Development & Proposals - Northeast

Loading...

26th Ward Water Pollution Control Plant, Plant Stabilization | Skanska in the US