Project status
Completed

Skanska was part of the VALTARI alliance, which constructed the Lahti end section of the ring road. The 4.5-kilometer stretch was the most technically demanding and cost-intensive part of the project, featuring three grade-separated interchanges, two road tunnels, and 12 bridge structures.
Väylävirasto
Infrastructure
Highways & Roads